How we work

Ten gates, and evidence at every one

From the intake of an idea to operations, a product passes ten gates. It passes none without recorded evidence, and the decisive gates belong to the decision maker.

Start your project

The gates

Follow the path as you scroll. Every gate has an owner, an output and a passing criterion.

  1. Intake and qualification

    The idea is recorded and qualified from its actual material; what is unknown is written «unknown».

    The team
  2. Discovery and feasibility

    An evidence registry and a feasibility memo: every claim classed as fact, estimate or assumption, with its source and date.

    The team
  3. Project authorisation

    A build charter with scope, budget and schedule, approved by the decision maker before any line of code.

    The decision maker
  4. Product and experience

    Requirements, user journeys and prototypes; Arabic first and the phone first.

    The team
  5. Architecture and planning

    The architecture, the threat model, the design decisions, the release map and a measurable execution plan.

    The team
  6. Build and integration

    A separate repository for the product, small changes through automated checks, and every increment recorded by its head.

    The team
  7. Independent validation

    Independent review of code, security and user experience; critical findings are fixed before moving on.

    The team
  8. Launch readiness

    A launch file with the evidence, the residual risks and the rollback plan; the launch follows a written decision.

    The decision maker
  9. Go to market

    Messages, audiences and channels from the product's real state; every claim passes the claims policy.

    The decision maker
  10. Operate and improve

    Operations reports, monitoring and releases; the gate is continuous and re-evaluated with every report.

    The team

Six steps on the path

  • 01

    Intake of the idea

    You write your idea with one return channel; it is recorded in the company system and comes back to you with a reference. Intake gate

  • 02

    Study

    A feasibility study on recorded evidence, with its source and date. Feasibility gate

  • 03

    Build charter

    Scope, budget and schedule approved by the decision maker before any line of code. Charter gate

  • 04

    Build

    Small changes in a separate repository for the product, with automated checks on every change. Automated-checks gate

  • 05

    Review

    Independent review, security review and the user-experience gate on phone and desktop in Arabic and English. Independent-review gate

  • 06

    Handover

    The repository, the database and the resource names are handed over with a written handover and exit plan. Handover gate

Handover and exit

You leave with your repository, your data and your keys

The handover plan is written with the charter, not at the end of the project: the repository with its full history, a database copy with its digest, the resource names, and the time our access is withdrawn.

  • The repository with its full history
  • The database with a verification digest
  • Resource and secret names — the values are re-issued to you
  • The date our access ends, in writing
FTGclientThe date our access ends, in writingThe repository with its full historyThe repository with its full historyThe database with a verification digestThe database with a verification digestResource and secret names — the values are re-issued to youResource and secret names — the values are re-issued to you